The Mar-New crew taking down the forms from the basement walls.
The basement walls and windows looking out over the lake.
Meanwhile......at Conquest the build is going on........
Floor joists with plumbing and heating pipes and things (I think) in the joists. Thankfully, there are well qualified people who do this work.
Half of the main floor. This will be the 1/2 the dining room, great room and bedroom section. We are getting excited now.
This view is from the other side of front of the house, looking from the bedroom towards the great room and dining room. Still the lake side though.
No comments:
Post a Comment