The build at Conquest, in Altona, will be done on Thursday, August 26. The three sections of the house will likely be placed by the crane on the 31st. Hope it is not a windy day. Between now and the 31 we need our basement contractor to do the piles for the veranda, move a shed, finish trimming the trees in the way. Our excavation company will dig the veranda piles, finish filling in the lot and spread a thin layer of gravel over where the crane and transports will be. Yikes. Thankfully we have great contractors to work with and have great faith that this will all come together.
The levelled lot as seen from the road. Murray, the bobcat operator did a great job.
Another view of the lot. The shed has to be moved for the crane to sit on that spot.
The lake side.